The trail West Point
A paved path on an 1848 wagon cut off, with four names in circulation and only one of them the city's
The Old Emigration Trail, two and a half miles of it, and shut in the middle.
West Point City calls it the Emigrant Trail and publishes that 2.5 miles of it are inside the city, running north to south and ending at 1300 North. Trail directories call it three other things. Underneath it is the Old Emigrant Road, the cut off first used in August 1848 and travelled by about 22,500 gold seekers in the two years after. The city publishes exactly one trailhead, a paved lot beside the cemetery, with nothing on it but the parking. And since 13 August 2026 the section between 700 South and 300 North has been closed while a highway is built across it.
My own ground is Iron and Washington counties at the far south end of the state, a long drive from the west edge of Davis County, so these pages are researched rather than lived. What is on them was taken where it is issued: West Point City's General Plan Update adopted 17 December 2024 and its Parks, Recreation and Trails Master Plan adopted 2 May 2023, the city's own park, cemetery, utility, events and public notice pages, its August 2026 newsletter and its statutory tax notice, the state transportation department's own site for the highway being built here, the North Davis Fire District, the Division of Wildlife Resources, the Census Bureau's geocoder, the state address point layer and the federal agricultural census for Davis County. Every figure carries the day it was read. A Davis County partner agent takes the ground level work.
The live question
Can you walk it today, and the answer on 20 August 2026 is not all of it.
The state transportation department publishes the current status on its own project site for the highway being built across the top of this path, and the notice is a week old. Checked in August 2026, it reads: as of Thursday, August 13, the Emigration Trail between 700 South and 300 North is now closed to the public. The closure is there to allow utility work, truck hauling, pile driving and construction of the new trail itself, and the same notice says portions of the trail are anticipated to reopen by the end of November, though schedules may be adjusted based on construction progress and weather conditions. That is the department's own wording and it is the only current statement of the trail's condition anywhere.
Every walking and cycling aggregator that carries this path describes it as open, because none of them has looked since. That is worth knowing in general and not only here: a paved municipal path is exactly the kind of asset that a trail directory records once and never revisits, and a trail directory has no reason to watch a highway project. The department building over the top of it does. If the section you want is between 700 South and 300 North, check the project site rather than a trail app, and check it again after the end of November rather than assuming the reopening happened on schedule.
The rest of the West Point section, north of 300 North up to the terminus at 1300 North and south of 700 South toward the city line, is not named in the closure. Neither is the paved east to west path along the southern edge of the city, which is a different trail with a different route number attached to it and is described further down this page. Nothing published by the city or the department suggests either of those is affected, but the same notice warns of intermittent construction noise and of heavy truck traffic continuing through spring 2027, and a road that is hauling dirt is a road that a walker will notice from a hundred yards away.
The West Point section, in numbers
2.5 mi
of the trail inside the city, on the city's own count
1300 N
the northern terminus, just west of the highway alignment
1
trailhead the city publishes, and it is by the cemetery
13 Aug 2026
the day the middle section closed to the public
The names
One path carries four names in circulation and only one of them belongs to a body that can settle it.
This is the confusion to clear before anything else, because it is why the trail looks like several trails when you go looking for it. Four names describe the same paved corridor and a fifth describes the wagon road underneath. Here is who uses each, checked in August 2026 unless a row says otherwise.
| The name | Who uses it | What it refers to | Is the source an issuing body |
|---|---|---|---|
| Emigrant Trail | West Point City, in both of its adopted plans | The paved north to south shared use path through the western side of the city | Yes. This is the municipality that owns the West Point section, and it is the name to prefer |
| Old Emigration Trail | TrailLink, Hiking Project and Walk Ride USA, and the state transportation department in its own construction notices | The same paved path | Partly. The department is an issuing body for the closure and uses this spelling; the directories are not issuing bodies for anything |
| Bluff Trail | AllTrails | The same path, named for the landform that runs beside it | No. The city records the alternate name and attributes it to the landform |
| Syracuse Trail | AllTrails, as a second listing over overlapping ground | The same path, read from the southern end | No. It is the next city south along the same corridor |
| The Old Emigrant Road | The Daughters of Utah Pioneers, and the newspaper account of the 1989 monument dedication | The historic wagon route itself, not the paved path | It is the monument's own subject. The road ran across the whole western county; the paved path sits on part of its bed |
The city's two adopted documents are the General Plan Update of 17 December 2024 and the Parks, Recreation and Trails Master Plan of 2 May 2023, both checked in August 2026. The transportation department notice was checked on 20 August 2026. The 1989 dedication account is the Deseret News of 30 August 1989, a newspaper of record reporting the Daughters of Utah Pioneers' own research, and is named as secondary. The aggregator names are recorded because they are what a search returns, not because they carry authority.
The city's own General Plan gives both ends of the path in one sentence: the Emigrant Trail is a north and south running shared use path that begins in Syracuse and ends at 1300 North in West Point. The Parks Master Plan expands that and adds the number that settles how much of it belongs to this town. It describes the trail as the main north to south regional shared use pathway in the city, tracing the route of the Old Emigration Road that once ran from Salt Lake City to City of the Rocks, Idaho, where it linked to the California Trail; it notes the alternate names Syracuse Trail and Bluff Trail, the second in reference to Schneiter's Bluff, a geologic feature that parallels the route; and it states that 2.5 miles of the trail lie inside the city boundary.
That figure is the honest measure of West Point's share and it is the only mileage on this page. No agency publishes a total length for the corridor. The walking directories give six miles and one gives 7.7, none of them is an issuing body, and neither this city nor the next one south publishes a figure for the whole thing. So the correct statement is the one the city makes: two and a half miles of it are here. If you want the rest of the corridor, it runs south into the next town, and about two thirds of the paved ground is over there rather than here.
What West Point does own outright, on the other hand, is the named end. The trail terminates at 1300 North, just west of the highway alignment, and everything published about the trail's future is in this city rather than the next one. The city's reading of the regional transportation plan lists a shared use path following the highway alignment north to 1800 North in a 2023 to 2032 window, a further path from 1800 North to the Weber County line in the same window, and an extension from 1300 North west to 5500 West in a 2043 to 2050 window. Every one of those is a plan rather than a thing, and the highway page is where the funded part of it is described at its actual stage.
There is one more naming trap worth naming once, because it is the easiest mistake available on this subject. This is not the Legacy Parkway Trail. That path runs at the far southern end of Davis County, its north end is in Farmington, and it never comes within twenty miles of here. Two long paved multi use paths in one county, roughly parallel, both running north and south beside a highway, is exactly the setup that produces a confident wrong answer. The practical city guide on this site lists both a Legacy Parkway Trail and a West Davis Corridor trail as nearby amenities for West Point and never names the Emigrant Trail at all, which is the wrong pair of trails and a missing one.
The trailhead
The city publishes exactly one place to leave a car and it is not where the trail directories put it.
The Parks Master Plan is unusually blunt about this. Trail users, it says, are currently served by a single trailhead just west of the West Point City Cemetery on 4000 West. The trailhead consists of a large parking lot that provides direct access to the Emigrant Trail and indirect access to the other regional path less than a quarter of a mile to the south. And then the sentence that matters most: there are no trailhead amenities at this location other than parking. No water, no toilet, no kiosk, no bike rack. A lot, and a way onto the path. The city's cemetery page gives the cemetery address as 80 North 4000 West, which puts the trailhead at roughly that corner.
This matters because two of the walking directories print a different answer. Both state that the north end of the trail is at 1300 North west of 4000 West, and both say there is a parking area along 1300 North. The city's own adopted plan, dated May 2023, says the city has one trailhead and it is by the cemetery. Two readings are possible and neither has been confirmed: either the 1300 North parking is informal roadside space rather than a facility, or it postdates the plan. Until somebody with authority publishes it, the sensible instruction is the conservative one. Park at the cemetery lot, which the city publishes, and treat 1300 North as the end of the path rather than as a place to leave a vehicle.
Two more trailheads are planned and neither exists. The same document proposes one at the west end of the city where trails along 1300 North would meet the federal flood boundary, and one in city owned open space in the southwest part of the city, each to receive parking, toilets, site furnishings and information kiosks when the trail system reaches them. Those are drawings in an adopted plan, which is a real and useful thing to know about a town's direction and is not a facility you can use.
The details
Getting there
Take 300 North west across the city to 4000 West, then turn south. The cemetery is on the east side of 4000 West and the lot sits immediately west of it, which is also the reason a first time visitor drives past it: the landmark on the map is the cemetery, not the trail. The other regional path, running east and west along the southern edge of the city, is reachable from the same lot less than a quarter of a mile to the south, though the city describes that access as indirect rather than as a signed connection.
Before you go
- Check the closure before you go, at the project site rather than at a trail directory. The directories all describe an open path and none of them has been updated since the closure began.
- There is nothing at the trailhead but parking. No toilet, no water fountain and no shelter is published, so carry what you need.
- The path is on a wagon road bed across farm ground and there is no shade of any consequence on it. In July and August that is the whole story of when to walk it.
- Heavy dirt hauling is expected to continue through spring 2027 near the highway alignment, and pile driving has been running on weekdays in daylight. A quiet walk is a morning or an evening question at the moment.
The road underneath
A cut off used to avoid hills and sand, and the reason a farm town has a paved path down the middle of it.
The route the paved path sits on had several names of its own. It was the Old Emigrant Road, it was the Old Traveled Road, and it was the Salt Lake Cutoff, and it ran from Salt Lake City north through what is now southern Idaho to meet the California and Oregon trails. The account the Daughters of Utah Pioneers assembled for the monument at the southern end of the corridor, reported in the Deseret News of 30 August 1989 and checked in August 2026, gives the reason it was preferred over the alternative: it avoided hills and sand and provided feed and water for livestock. That is a fair description of the western Davis County flat, which is why the road came this way and not over higher ground.
The same account dates the first use to August 1848, when Captain Samuel Hensley and ten men came through, followed by members of the Mormon Battalion returning from California with seventeen wagons, forty five men and one woman. About 22,500 gold seekers used the route in 1849 and 1850, and it was heavily travelled from 1852 to 1857 by families bound for California and Oregon. Those figures are the monument's research reported by a newspaper rather than a state or federal record, and they are given here as that.
The single most useful sentence in the whole account, for anybody trying to picture where the road ran, is a geographic one: Bluff Road through western Davis County roughly follows the original path of the historic Emigrant Road. That is a corridor across several municipalities rather than a feature of any one of them, and it is why the paved path today crosses two city lines and picks up a different name in each place. The road belonged to the county before any of these towns existed.
The monument that commemorates all of this is not in West Point. The Daughters of Utah Pioneers and the City of Syracuse installed it at the southern end of the corridor, and the 1989 dedication account places the ceremony at nine in the morning on Saturday 9 September 1989 on chapel grounds on Bluff Road in Syracuse. That marker, and the southern trailhead beside it, belong to the next town's own pages and this one does not describe them. What belongs here is the northern end, the two and a half miles, the one car park and the road bed they all sit on.
A wagon route chosen because it avoided hills and sand is now a paved path across a town that is still mostly fields. The reason it is flat and the reason it is straight are the same reason.
The second path
There is an east to west one as well, and it answers a question the practical city guide left open.
The city has exactly two existing regional shared use paths and together they are its entire regional trail system. The second runs east and west along the southern edge of the city, connecting the north to south path in the west with Syracuse, Clearfield and destinations further east. The Parks Master Plan describes it as passing just south of the golf course before jogging north and then east between 200 South and the state highway, and states that 2.2 miles of it lie inside West Point. Add that to the 2.5 miles of the other one and you have 4.9 miles, which is exactly the plan's own figure for the city's existing regional path mileage. Two trails, and that is all of it.
The plan calls this path the SR 93 Trail and repeats that spelling three times. The city's General Plan calls the same path the SR-193 trail. SR-193 is the correct route number; it is the road that runs east across Clearfield and Layton, and there is no SR-93 in this part of the state. One of the two adopted city documents has a typographical error in it, three times over, and the other one is right.
What makes the second path worth a section rather than a sentence is where it goes. The plan states that it eventually links with the Denver and Rio Grande Western Rail Trail far to the east, which extends from Roy to Centerville through Weber and Davis counties. The practical city guide on this site lists a rail trail among West Point's nearby amenities and then hedges, saying the exact named rail-trail segment reaching West Point should be confirmed before relying on it. It is confirmable and the city confirms it: the connection is the SR-193 trail, the rail trail it reaches is the Denver and Rio Grande Western, and it runs Roy to Centerville. That hedge can come off.
Both paths are part of a much larger drawing. The Parks Master Plan sets a build out trail system of 46.1 miles, made up of the 4.9 miles that exist, 20.8 miles of proposed regional shared use path, 6.5 miles of proposed local shared use path and 13.9 miles of proposed local routes, at a probable cost for trails and trailhead improvements of 13,333,000 dollars. That is a plan and a cost estimate in an adopted document, not a programme with money behind it, and the difference between 4.9 and 46.1 is the honest size of the gap.
Why the footways run out
The same plan explains something a visitor notices in the first ten minutes here, which is that a lot of the streets have no footway on either side. Its answer is an agricultural one and it is worth quoting because it connects this page to every other page in this companion: many of the roads in West Point lack sidewalks, which is a direct result of the city's rural and agricultural roots and road standards.
That is why a town with a paved regional path down one side of it can still feel like a place you would not walk across. The path was built as a trail; the streets were built as farm roads and then had houses added to them. Anybody weighing an address here on how walkable it is should look at the specific street rather than at the city, because the two answers are genuinely different.
Living with it
A flat, straight, shadeless path with a highway going in over the middle of it.
For the next two years this is a trail with a construction project on it, and there is no way to describe it honestly without saying so first. The middle section is closed. Pile driving has been running on weekdays. Heavy hauling is expected until spring 2027. Portions are anticipated back by the end of November, which is a forecast made by the people doing the work and is exactly as reliable as any construction forecast. If a household is weighing an address partly on this path, the useful question is not whether the trail is nice but whether the next two summers on it are acceptable, and that is answerable by standing at 300 North on a weekday morning.
After that, what the path is likely to be is a straight, flat, well surfaced route through farm ground with a thirty foot rise on one side of it, no shade to speak of and very little traffic noise once the work is done. It is not a scenic trail and nobody should sell it as one. It is a useful one: a continuous north to south route across two cities that does not require crossing an arterial, which in this part of the county is rarer than it sounds.
The landform it runs beside is worth understanding separately, because it explains more about this town than the trail does. The page on Schneiter's Bluff covers the thirty foot step, the soils above and below it, the two water districts it divides and the marsh at the bottom of the slope. And the reason the trail is closed at all, along with the interchange, the three bridges and the growth figures behind the whole project, is on the highway page.
One last practical note about the southern end. About two thirds of the paved corridor is in the next city rather than this one, so a long day out on this path spends most of its time over the line. The monument, the southern trailhead and the pond that gives the path one of its aggregator names are all on that side, and they belong to that town's own pages rather than to this one. West Point's part of it is the northern two and a half miles, the terminus, the one car park and the road bed underneath, which is a modest and completely honest claim.
Do not plan a walk here from a trail directory. Every one of them describes an open path and the section in the middle has been shut since 13 August 2026. The state transportation department publishes the closure on its own project site for the highway, checked in August 2026, and it is the only body updating it. The named limits are 700 South to 300 North. Portions are anticipated to reopen by the end of November, with the department saying schedules may be adjusted based on construction progress and weather conditions, which is a warning and not a caveat. The project hotline is 877-298-1991. Separately, the city publishes one trailhead and it is the lot by the cemetery on 4000 West; the parking on 1300 North that two directories describe is not in any published city document, so do not drive out there expecting a facility.
Keep reading
The rest of West Point on The Local.
The landform
Schneiter's Bluff
A thirty foot step decides which ground drains and which district bills the water.
Read the guideThe highway
The West Davis Corridor
A sixteen mile highway stops here, and three bridges are going up over city streets.
Read the guideThe parks
Loy Blake Park
Twenty six acres, 298 parking spaces, and a memorial dedicated one November day.
Read the guideThe Fourth
Party at the Point
A parade, four tournaments, a baby contest and a scramble the morning before.
Read the guideMoving here
The last farm ground
No field here develops until its irrigation water is signed over to the city.
Read the guideThe whole set
West Point, in full
A farm town with a published plan to triple, and the ordinance that opens the gate.
Open the companionQuick answers
The trail, answered.
Not all of it. The state transportation department publishes on its own project site for the West Davis Corridor, checked in August 2026, that as of Thursday, August 13, the Emigration Trail between 700 South and 300 North is now closed to the public. The closure allows utility work, truck hauling, pile driving and construction of the new trail, and the same notice says portions of the trail are anticipated to reopen by the end of November, though schedules may be adjusted based on construction progress and weather conditions. Every walking and cycling directory that carries this path still describes it as open, because none of them has been updated. Check the project site, not a trail app.
Two and a half miles. The city's Parks, Recreation and Trails Master Plan, adopted 2 May 2023, states that 2.5 miles of the trail are inside the city boundary. That is the only mileage on this page, because no agency publishes a total length for the whole corridor. Walking directories give six miles and one gives 7.7, none of them is an issuing body, and neither this city nor the next one south publishes a figure for the entire path. About two thirds of the paved corridor is in the next city rather than in West Point, so the honest statement is the city's own: two and a half miles of it are here.
At the lot beside the cemetery. The city's Parks, Recreation and Trails Master Plan states that trail users are currently served by a single trailhead just west of the West Point City Cemetery on 4000 West, that it consists of a large parking lot providing direct access to the trail and indirect access to the other regional path less than a quarter of a mile to the south, and that there are no trailhead amenities at this location other than parking. The cemetery address is 80 North 4000 West. Two trail directories instead describe parking along 1300 North at the northern end, which no city document confirms.
The city calls it the Emigrant Trail, in both of its adopted plans, and that is the name to prefer because West Point is the municipality that owns this section. The state transportation department writes Emigration Trail in its construction notices. Trail directories variously use Old Emigration Trail, Bluff Trail and Syracuse Trail, the second of those after the landform running beside it and the third after the city to the south. Underneath all four is the historic wagon route itself, which was called the Old Emigrant Road, the Old Traveled Road and the Salt Lake Cutoff, and which is the subject of a monument at the southern end of the corridor.
A wagon cut off from Salt Lake City running north through what is now southern Idaho to meet the California and Oregon trails. The account the Daughters of Utah Pioneers assembled for the monument at the southern end of the corridor, reported in the Deseret News of 30 August 1989, says it was preferred over the alternative because it avoided hills and sand and provided feed and water for livestock. It records first use in August 1848 by Captain Samuel Hensley and ten men, then by Mormon Battalion members returning from California with seventeen wagons, forty five men and one woman, about 22,500 gold seekers in 1849 and 1850, and heavy family traffic from 1852 to 1857.
In Syracuse, at the southern end of the corridor rather than in West Point. The Deseret News of 30 August 1989 reported that the Daughters of Utah Pioneers and the City of Syracuse would dedicate the monument at nine in the morning on Saturday 9 September 1989, on chapel grounds on Bluff Road in Syracuse. The marker and the southern trailhead beside it belong to that city's own pages and are not described here. What the 1989 account does give West Point is the geography of the whole route in one line: Bluff Road through western Davis County roughly follows the original path of the historic Emigrant Road, which is a corridor across several municipalities.
Yes, as part of the highway project, and further extensions are planned but not funded. The transportation department's own project overview states that the trail is extended as part of the current work, from 1300 North to 1800 North. Press coverage has described the extension as running from 1300 North to the Weber County line, which is a longer claim than the department makes, so the department's wording is the one printed here. Beyond that, the city's reading of the regional transportation plan lists a path north to 1800 North and a further path from 1800 North to the county line in a 2023 to 2032 window, and an extension from 1300 North west to 5500 West in a 2043 to 2050 window.
An east to west path along the southern edge of the city, with 2.2 miles of it inside West Point. The Parks Master Plan describes it running just south of the golf course before jogging north and then east between 200 South and the state highway, connecting the north to south trail in the west with Syracuse, Clearfield and destinations further east, and eventually linking to the Denver and Rio Grande Western Rail Trail, which extends from Roy to Centerville. The plan calls it the SR 93 Trail three times and the city's General Plan calls it the SR-193 trail; SR-193 is the correct route number. Together the two paths are the city's entire 4.9 miles of existing regional trail.
No, and confusing the two is the easiest mistake to make about this subject. The Legacy Parkway Trail runs at the far southern end of Davis County, its northern end is in Farmington, and it never comes within about twenty miles of West Point. Two long paved multi use paths in one county, both running roughly north to south beside a highway, is exactly the setup that produces a confident wrong answer. The practical city guide on this site lists both a Legacy Parkway Trail and a West Davis Corridor trail among West Point's nearby amenities and never names the Emigrant Trail at all, which is the wrong pair and a missing one.
Two and a half miles of a wagon road, with a bridge going in over the top.
This path is the oldest thing in West Point that you can still walk on, and for the next couple of years part of it is a building site. If you are weighing a street near it, the questions worth asking are which side of the closure the address sits on, how far it is from the pile driving, and whether the hauling route runs past the end of the road. Those are answerable in an afternoon by anybody standing in the right place. Tell me which streets you are looking at and I will put you with a Davis County partner agent who can walk them with you, and stay on the file for the financing side.
Referral disclosure. Outside Southern Utah, I connect home sellers and buyers with partner agents I trust in their area. If you choose to work with an agent I refer, that agent's brokerage pays my brokerage (Real Broker, LLC) a referral fee. The fee comes out of the agent's compensation; it is not an added cost to you. You are always free to choose any agent you wish, and using a referred agent is never required.