Next door Bluffdale
A planned north end and a very large neighbour
Independence, and the build going up over the boundary.
About 296 acres off the 14600 South exit of I-15, drawn as one plan with roughly 1,900 homes in it, streets named for American ideals and a park with a rope tower and a two storey slide in the middle. Immediately north east of it, on the Draper side of the line, a 600 acre redevelopment went vertical on 29 June 2026. Here is what is on the ground here, what is genuinely next door, and what a buyer should read before the due diligence period ends.
Southern Utah is my home turf. Bluffdale is not, so these pages are researched rather than lived: checked against city, county and venue sources, and dated so you can see how fresh they are. For the on-the-ground work here I lean on a Salt Lake County partner agent.
The ground
Two hundred and ninety six acres laid out at once, off one motorway exit.
Independence at the Point occupies about 296 acres in the north eastern corner of Bluffdale, immediately off the 14600 South exit of I-15. It was drawn as one plan rather than accumulated street by street, and the published intention is roughly 1,900 homes across detached houses, townhouses and flats. That is a substantial share of a city that the 2020 census counted at 17,364 people.
What that produces on the ground is a street pattern that reads differently from the rest of Bluffdale. The older core of this city is large lots on a loose grid with fences, outbuildings and in places horses. Independence is close spacing, connected footways, a maintained landscape between the buildings, and a paved bicycle path running along the northern and western edges of the development.
The naming scheme is deliberate and hard to miss. Streets, parks and monuments here are named for American ideals rather than for pioneers, orchards or the family that farmed the ground, which is the usual convention in the south valley. Freedom Point, Noell Nelson Drive and Rebellion Court sit on the city's own published facility list, which is a fair indication of how thoroughly the theme was carried through.
The park in the middle
A splash pad, a rope tower and a two storey slide.
Independence Park is the piece of this development that anybody can use, and it is genuinely worth the trip from elsewhere in the city rather than being a patch of grass with a swing on it.
The park is landscaped with pavilions scattered through it and several separate areas to play. The splash pad carries a set of coloured spouts and sprayers rather than a single fountain, and it runs on the city's own season, Memorial Day to Labor Day, from ten in the morning until eight at night, which is a longer daily window than the county park across the city keeps.
The playground is built around a large climbing rope structure with a two storey slide off it, which is the tallest piece of play equipment in this end of the city and the reason children ask to come back. There are multiple structures around it, so the park works for a wide range of ages at once rather than for one.
The city lists the park on its own facility roster with two bookable fields, which means it is in the municipal system rather than being private ground. Bookings and questions go to Bluffdale City Hall on 801-254-2200 in the same way as for any other city park.
A splash pad running eleven hours a day is doing more for a summer week here than any amount of landscaping.
Over the boundary
The Point is not in this city, and it is going to change this end of it anyway.
The 600 acre redevelopment of the former Utah State Prison ground sits in Draper, north east of the Bluffdale line, which means this city gets a share of the traffic, the construction and eventually the jobs without having any say over the plan. That is the honest shape of the relationship and it is worth understanding before an address here is priced.
| Delivered | Under construction | Announced | |
|---|---|---|---|
| What it is | Site infrastructure, roads, utilities and the ground work of the first district | The 104 acre first district, which went vertical on 29 June 2026 | The wider 600 acre plan across later districts |
| The named pieces | The prison site cleared and the first phase groundbreaking, late 2024 | A 5,000 seat arena carrying the Mountain America Event Center name, and Chroma | Office, housing and retail phased across the years after the first district |
| When | Through 2025 and into 2026 | First openings stated for 2028 | No published completion for the whole |
| What Bluffdale sees now | Construction traffic and a changed skyline on the north east horizon | Cranes, and a build that will run for years | Nothing yet, and a great deal of speculation |
| Who decides it | The state and the Draper side of the boundary | The same | The same |
Status as published by the project and reported at the 29 June 2026 vertical construction milestone, checked 7 August 2026. Delivered, under construction and announced are three different things and a development of this size will keep moving between them, so confirm current status before treating any of it as a reason to buy.
There are two venues in Draper called Mountain America Event Center, and they are not the same building. One is the hall at the Loveland Living Planet Aquarium, which opened in February 2026. The other is the 5,000 seat arena being built in the first district at The Point. They share a naming rights sponsor and nothing else, they are separate addresses, and an event listing that names only the sponsor tells you nothing about which one you are going to. Check the street address on the ticket rather than the venue name.
The doorstep question
What is actually different about being next to it rather than in it.
Draper owns the project and Draper's page takes the tour of it: what is built, what is rising and what is still a drawing. What belongs to Bluffdale is narrower and more practical. This city gets the through traffic on the roads that feed the site, the construction years, the pressure on the same I-15 interchanges, and eventually a large employment centre about ten minutes from its north eastern streets without a single line of it appearing on a Bluffdale tax roll.
The traffic point is the one to take seriously in the near term. The Point sits at the pinch where the valley narrows at the Point of the Mountain, which is already the most constrained stretch of I-15 between two metropolitan areas. Adding a district of that size on ground beside it does not make that pinch easier during the years it is being built. Drive the interchange at your real commute hour before you decide what proximity is worth.
The employment point is the one to take seriously in the long term, and it is the one nobody can size yet. First openings are stated for 2028. A projected job count for a development that has just gone vertical is a plan, not a payroll, and the difference between those two is exactly the difference between an announced number and a delivered one. Draper's commute page covers the interchange itself.
The other thing worth separating is the ground immediately south of the project, which is Bluffdale's and is not part of it. The gravel operations at the Point on the Draper side have been the subject of a long running land use argument, and what that ground eventually becomes will shape this corner of the valley for decades. It is a live question rather than a settled one, and nobody weighing an address nearby should treat any particular outcome as decided.
For a household actually buying in the north east of Bluffdale, the useful exercise is to separate three things: what is on the ground today, what is under construction and will be finished in a known year, and what is drawn. Only the first of those is something you are buying. The second is a reasonable expectation. The third is a hope, and hopes have been revised on this site before.
The rest of the practical picture, including what the 14600 South closure does to reaching this corner of the city, sits on the mover page.
The paperwork
A planned community lot carries more recorded documents than an ordinary one.
This is the part that catches buyers who have only ever bought on an ordinary subdivided lot, and it is worth saying plainly rather than discovering at signing. Ground laid out as a single planned community carries recorded instruments that an older large lot street in the same city does not, and they run with the land rather than with the seller. They are public records, they are obtainable in advance, and they set out things that affect what you may build, park, plant and change.
The due diligence period is when to read them. Not the week before closing, not after. Ask for the complete recorded set at the start of the period rather than a summary, read them yourself as well as having them read, and get any question you cannot answer from the documents answered in writing before the period ends. A partner agent who works this ground regularly will know which documents to ask for and who holds them.
None of that is a reason to avoid a planned community. It is a reason to price the reading time into the timetable. The physical things people actually buy here, which are the paths, the parks, the water features, the maintained landscape between the buildings and the way the streets connect, are all visible on a walk and are worth walking before the paperwork lands.
The single best hour you can spend before buying anywhere in this development. Park at Independence Park on Noell Nelson Drive and walk the bike path along the northern and western edges of the development to wherever it puts you, then walk back through the middle. That hour tells you how far the shops, the schools and the arterials really are on foot, how the paths connect and where they stop, how much of the landscape is maintained and how much is left, and what the road noise from I-15 sounds like at the eastern edge. A plan drawing cannot tell you any of that, and neither can a listing.
Keep reading
More of Bluffdale on The Local.
Things to do
The top 6, ranked
A county showcase park, a July rodeo, a pump track, and a river coming through a gap.
Read the guideThe new road
The Mountain View Corridor opens
Four miles of new freeway, five footbridges and a trail, open since December 2025.
Read the guideThe river
Where the Jordan River comes in
The gap the river uses to enter this county, and the power plant ruins beside it.
Read the guideThe park
Bluffdale City Park and the arena
Twenty two acres, an equestrian arena at the west end, and the rodeo it holds in July.
Read the guideMoving here
The last city in the county
Two counties, one city line, and what a southern boundary address actually asks.
Read the guideThe companion
Bluffdale, the whole picture
The new road, the river gap, the arena, the planned north end and the address, together.
Read the pageQuick answers
The north end, answered.
A planned community of about 296 acres in the north eastern corner of Bluffdale, immediately off the 14600 South exit of I-15. The published plan is roughly 1,900 homes across detached houses, townhouses and flats, laid out at once rather than accumulated street by street, with a connected footway network, a paved bicycle path along the northern and western edges, and streets, parks and monuments named for American ideals.
At 15245 South Noell Nelson Drive, on the city's own published facility list. It is landscaped with pavilions through it and several separate play areas, including a splash pad with coloured spouts and sprayers and a playground built around a large climbing rope structure with a two storey slide. The splash pad runs on the city season, Memorial Day to Labor Day, from 10am to 8pm. Bookings go through Bluffdale City Hall on 801-254-2200.
Draper. The 600 acre redevelopment of the former Utah State Prison ground sits north east of the Bluffdale city line, so Bluffdale gets the construction traffic, the pressure on the same I-15 interchanges and eventually the proximity to a large employment centre, without any say over the plan or any of it on its tax roll. Draper's companion page covers the project itself in detail.
As of 7 August 2026, site infrastructure and the ground work of the first phase are delivered, and the 104 acre first district went vertical on 29 June 2026 with first openings stated for 2028. That district includes a 5,000 seat arena carrying the Mountain America Event Center name and the Chroma development. The wider 600 acre plan across later districts is announced rather than built. Those three states are different things and worth keeping separate.
There are two in Draper and they share only a naming rights sponsor. One is the hall at the Loveland Living Planet Aquarium, which opened in February 2026. The other is the 5,000 seat arena under construction in the first district at The Point, which is a separate site with a separate address. An event listing that names only the sponsor does not tell you which building you are going to, so check the street address on the ticket.
That depends entirely on separating what is delivered from what is announced, and on driving the I-15 interchange at the hour you would actually use it rather than on a quiet Saturday. The Point sits at the pinch where the valley narrows at the Point of the Mountain, and a build of that size does not make that stretch easier during the years it is under construction. A projected job count for a district that has just gone vertical is a plan rather than a payroll.
Ground laid out as a single planned community carries recorded instruments that an older large lot street in the same city does not, and they run with the land rather than with the seller. They are public records and they are obtainable in advance. Ask for the complete recorded set at the start of the due diligence period rather than a summary, read them rather than skim them, and get anything you cannot answer from the documents answered in writing before the period closes.
Off the 14600 South exit of I-15, which is the exit the development is named from. Note that 14600 South itself has been closed between Spring View Parkway and 1010 West since 17 November 2025 while a rail underpass is replaced, so the east to west crossing of the city is not currently available at that street. Check the published detours before setting a route, because the closure changes the approach from the western half of the city entirely.
The bicycle path along the northern and western edges of the development, out to wherever it delivers you, and then back through the middle. That hour shows you how far the shops, schools and arterials genuinely are on foot, where the path network connects and where it stops, how much of the landscape is maintained, and what the road noise from I-15 is like at the eastern edge on an ordinary weekday. None of that is visible on a plan drawing or in a listing.
A planned north end and a very large neighbour are two separate decisions.
One of them is about a street, a path network and a set of recorded documents you can read in the due diligence period. The other is about a 600 acre build in another city that will be under construction for years before it is anything else. Tell me which of the two is actually driving your thinking and a Salt Lake County partner agent will walk the ground with you, while I stay on the file for the homework and the financing side.
Referral disclosure. Outside Southern Utah, I connect home sellers and buyers with partner agents I trust in their area. If you choose to work with an agent I refer, that agent's brokerage pays my brokerage (Real Broker, LLC) a referral fee. The fee comes out of the agent's compensation; it is not an added cost to you. You are always free to choose any agent you wish, and using a referred agent is never required.