Next door Bluffdale
A planned community, and a very large neighbor across the line
Independence in Bluffdale, and the big build across the line
Independence is a large planned community in the northeast corner of Bluffdale, about 296 acres off the 14600 South exit of I-15, drawn as one plan with parks, trails and a splash pad in the middle. Across the city line to the northeast, in Draper, developers broke ground in June 2026 on The Point, a 600-acre redevelopment of the old state prison ground. Here is what is actually on the ground, what is genuinely next door, and what a buyer should read before the due diligence period ends.
The short answer
Independence is a large planned community in the northeast corner of Bluffdale, off the 14600 South exit of I-15, laid out as one plan rather than added street by street. The Point, the 600-acre redevelopment of the old state prison ground, is right next door but across the city line in Draper, so Bluffdale gets the traffic and, in time, the proximity to a large workplace without any say over the plan or any of it on its tax roll. On the ground here you get a compact street grid, a maintained landscape between the buildings, a paved path along the northern and western edges, and Independence Park with a splash pad, a rope tower and a two-story slide. The published plan is for roughly 1,900 homes phased in over years. Before you weigh an address, separate what is built from what is only drawn, and drive the I-15 interchange at your real commute hour.
The ground
About 296 acres, laid out at once off one freeway exit
Independence occupies about 296 acres in the northeast corner of Bluffdale, off the 14600 South exit of I-15. It was drawn as one plan rather than added street by street, and the published plan is for roughly 1,900 homes across houses, townhomes and apartments, phased in over years. That is a large addition to a city the 2020 census counted at 17,364 people.
What that produces on the ground reads differently from the rest of Bluffdale. The older core of the city is large lots on a loose grid, with fences, outbuildings and in places horses. Independence is close spacing, connected walkways, a maintained landscape between the buildings, and a paved path running along the northern and western edges of the community.
The naming is deliberate and hard to miss. Streets, parks and monuments here are named for American ideals rather than for pioneers, orchards or the family that farmed the ground, which is the usual convention in the south end of the valley. Freedom Point, Noell Nelson Drive and Rebellion Court are on the city's own park and facility list, which is a fair sign of how thoroughly the theme was carried through.
The park in the middle
A splash pad, a rope tower and a two-story slide
Independence Park is the piece of the community anyone can use. It sits at 15245 South Noell Nelson Drive, and it is worth the trip from elsewhere in the city rather than being a patch of grass with a swing on it.
The park is landscaped with pavilions scattered through it and several separate areas to play. The splash pad carries a set of colored spouts and sprayers rather than a single fountain, and it runs on the city's own season, Memorial Day to Labor Day, daytime into the evening, a longer daily window than the county showcase park across the city keeps.
The playground is built around a large climbing rope structure with a two-story slide off it, the tallest piece of play equipment in this end of the city and the reason children ask to come back. Several structures surround it, so the park works for a range of ages at once.
The city lists the park on its own facility roster with two bookable fields, so it is in the municipal system rather than private ground. Bookings and questions go to Bluffdale City Hall at 801-254-2200, the same as for any other city park.
A splash pad open ten hours a day does more for a summer week here than any amount of landscaping.
Over the line
The Point is in Draper, not here, and it will change this end of Bluffdale anyway
The 600-acre redevelopment of the former state prison ground sits in Draper, across the line to the northeast, so Bluffdale gets a share of the traffic and the construction without a say over the plan. That is the honest shape of the relationship, and it is worth understanding before an address here is priced.
| On the ground now | In the first phase | Announced beyond it | |
|---|---|---|---|
| What it is | The prison relocated, the site cleared, and roads and utilities for the first phase under way | A 104-acre downtown district now taking shape | The rest of the 600-acre plan |
| The named pieces | The first-phase groundbreaking on 29 June 2026 | A 5,000-seat arena carrying the Mountain America Event Center name, and Chroma, apartments over ground-floor shops | Offices, housing and retail across later phases, with no set completion |
| What Bluffdale sees | Construction traffic and a changed skyline on the northeast horizon | Years of building on the ground beside the interchange | Nothing yet, and a lot of speculation |
On the ground now, in the first phase, and announced are three different things, and a project this size keeps moving between them. Confirm the current state before treating any of it as a reason to buy.
There are two venues in Draper called Mountain America Event Center, and they are not the same building. One is the event hall at the Loveland Living Planet Aquarium, which opened in February 2026. The other is the 5,000-seat arena in the first phase at The Point. They share a naming rights sponsor and nothing else, they sit at separate addresses, and a listing that names only the sponsor tells you nothing about which one you are going to. Check the street address on the ticket, not the venue name.
Next door, not in it
What is different about being beside The Point rather than in it
Draper owns the project, and Draper's page takes the full tour of it: what is built, what is taking shape and what is still a drawing. What belongs to Bluffdale is narrower and more practical. This city gets the through traffic on the roads that feed the site, the construction years, and the pressure on the same I-15 interchanges, and it sits about ten minutes from what is planned as a large workplace, without a line of it on a Bluffdale tax roll.
The traffic is the part to take seriously in the near term. The Point sits at the pinch where the valley narrows at the Point of the Mountain, already the most constrained stretch of I-15 between two metro areas. Adding a district this size on the ground beside it does not make that pinch easier while it is being built. Drive the interchange at your real commute hour before you decide what being close is worth. Draper's commute page covers the interchange itself.
The ground immediately south of the project is Bluffdale's and is not part of it. Gravel operations at the Point on the Draper side have been the subject of a long-running land-use dispute, and what that ground eventually becomes will shape this corner of the valley. It is a live question, not a settled one, and nobody weighing a nearby address should treat any particular outcome as decided.
For a household actually buying in the northeast of Bluffdale, the useful exercise is to separate three things: what is on the ground today, what is being built in the first phase, and what is only drawn. Only the first is something you are buying. The rest of the practical picture, including what the 14600 South closure does to reaching this corner, sits on the page on moving here.
The paperwork
A planned-community lot carries more recorded documents than an ordinary one
This is the part that catches buyers who have only ever bought on an ordinary subdivided lot, and it is worth saying plainly rather than discovering at signing. Ground laid out as a single planned community carries recorded documents that an older large-lot street in the same city does not, and they run with the land rather than with the seller. They are public records, you can get them in advance, and they set out what you may build, park, plant and change.
The due diligence period is when to read them, not the week before closing and not after. Ask for the complete recorded set at the start of the period rather than a summary, read them yourself as well as having them read, and get any question you cannot answer from the documents answered in writing before the period ends. A partner agent who works this ground regularly will know which documents to ask for and who holds them.
None of that is a reason to avoid a planned community. It is a reason to price the reading time into the timetable. The physical things people actually buy here, the paths, the parks, the water features, the maintained landscape between the buildings and the way the streets connect, are all visible on a walk, and they are worth walking before the paperwork lands.
The single best hour you can spend before buying anywhere in this community. Park at Independence Park on Noell Nelson Drive and walk the paved path along the northern and western edges out to wherever it puts you, then walk back through the middle. That hour tells you how far the shops, the schools and the main roads really are on foot, how the paths connect and where they stop, how much of the landscape is maintained and how much is left, and what the freeway noise from I-15 sounds like at the eastern edge. A plan drawing cannot tell you any of that, and neither can a listing.
Scott Buehler
Moving Utah About Scott
Keep reading
More of Bluffdale on The Local
Across the line
The Point, in Draper
The project itself: what has broken ground, what is in the first phase, and what is still a drawing.
Read the guideThe new road
The Mountain View Corridor opens
Four miles of new freeway, five footbridges and a trail, open since December 2025.
Read the guideThe river
Where the Jordan River comes in
The gap the river uses to enter this county, and the power plant ruins beside it.
Read the guideThe park
Bluffdale City Park and the arena
Twenty two acres, an equestrian arena at the west end, and the rodeo it holds in July.
Read the guideMoving here
The last city in the county
Two counties, one city line, and what a southern boundary address actually asks.
Read the guideThe companion
Bluffdale, the whole picture
The new road, the river gap, the arena, the planned north end and the address, together.
Read the pageQuick answers
The north end, answered
A planned community in the northeast corner of Bluffdale, off the 14600 South exit of I-15. It was drawn as one plan across about 296 acres rather than added street by street, and it mixes single-family homes, townhomes and apartments with parks, a walkway and trail network, and some commercial ground. The published plan is for roughly 1,900 homes phased in over years, and the streets, parks and monuments are named for American ideals.
At 15245 South Noell Nelson Drive. It is landscaped with pavilions and several separate play areas, including a splash pad with colored spouts and sprayers and a playground built around a large climbing rope structure with a two-story slide. The splash pad runs on the city season, Memorial Day to Labor Day, from 10am to 8pm. Bookings and questions go through Bluffdale City Hall at 801-254-2200.
Draper. The 600-acre redevelopment of the former state prison ground sits across the city line in Draper, northeast of Bluffdale, so Bluffdale gets the construction traffic and the pressure on the same I-15 interchanges without any say over the plan or any of it on its tax roll. Draper's own page covers the project itself in detail.
As of 2026, the former prison has been relocated, the site is cleared, and roads and utilities for the first phase are under way. Developers broke ground on the first phase, a 104-acre downtown district, on 29 June 2026, and that phase includes a 5,000-seat arena carrying the Mountain America Event Center name and Chroma, a mix of apartments over ground-floor shops. The wider 600-acre plan is announced rather than under way. Those are three different things and worth keeping separate.
There are two in Draper and they share only a naming rights sponsor. One is the event hall at the Loveland Living Planet Aquarium, which opened in February 2026. The other is the 5,000-seat arena in the first phase at The Point, a separate site with a separate address. A listing that names only the sponsor does not tell you which building you are going to, so check the street address on the ticket.
That depends on separating what is on the ground today from what is only announced, and on driving the I-15 interchange at the hour you would actually use it rather than on a quiet Saturday. The Point sits where the valley narrows at the Point of the Mountain, and a build this size does not make that stretch easier while it is under construction. A projected job count for a phase that has just broken ground is a plan, not a payroll.
Ground laid out as a single planned community carries recorded documents that an older large-lot street in the same city does not, and they run with the land rather than with the seller. They are public records and you can get them in advance. Ask for the complete recorded set at the start of the due diligence period rather than a summary, read them yourself, and get anything you cannot answer from the documents answered in writing before the period closes.
Off the 14600 South exit of I-15, the exit the community is named from. Note that 14600 South has been closed between Spring View Parkway and 1010 West since November 2025 while a rail underpass is rebuilt, so the east-to-west crossing of the city is not available at that street for now. Check the posted detours before you set a route, because the closure changes the approach from the western half of the city.
Park at Independence Park and walk the paved path along the northern and western edges of the community out to wherever it puts you, then walk back through the middle. That hour shows you how far the shops, schools and main roads really are on foot, where the path network connects and where it stops, how much of the landscape is maintained, and what the freeway noise is like at the eastern edge on an ordinary weekday. None of that shows up on a plan drawing or in a listing.
A planned north end and a very large neighbor are two separate decisions
One is about a street, a path network and a set of recorded documents you can read in the due diligence period. The other is about a 600-acre build in another city that stays a construction site for years before it is anything else. Tell me which of the two is actually driving your thinking, and a Salt Lake County partner agent will walk the ground with you while I stay on the file for the homework and the financing side.
Or call Scott: (435) 357-4345or send Scott a message
Keep going
Continue your Bluffdale research
Eight more doors into Bluffdale, chosen for what this page covers.
Questions about Bluffdale?
Call Scott, send a message, or find out what your Bluffdale home is worth. No pressure, no obligation.
Referral Disclosure: For moves outside Southern Utah, I can connect you with trusted local agents. If you choose to work with one, their brokerage pays my brokerage (Real Broker, LLC) a referral fee from their commission. This costs you nothing extra, and you are never obligated to use my referral.