The district Orem
A mall of 1973, rebuilt rather than abandoned
University Place, and the street they cut through it
University Mall opened in March 1973 and is being rebuilt rather than demolished, which is not how that generation of enclosed malls usually ended: roughly 120 acres under a revitalization reported at around 500 million dollars, on the order of 1.2 million square feet of retail with more than 150 stores, apartments, offices, a cinema, and a new public street called Park Avenue running through the middle of it. The free part is two acres of programmed green called The Orchard.
The short answer
University Place is Orem's town center: the old University Mall, on the corner of University Parkway and State Street, opened in 1973 and, unusually for a mall of its age, rebuilt rather than torn down. Today it is a mixed use district of roughly 120 acres, with more than 150 stores, apartments, offices and a cinema, a new public street called Park Avenue cut through the middle, and a free two acre green called The Orchard that runs events all year. It is the one address in Orem you can genuinely reach without a car, and it is where much of the city's newest housing is going. It is also a live, multi phase construction site, so some of what you read about it is built and some is still on the drawing board.
Start here
A 1973 enclosed mall that refused to do what enclosed malls did
University Mall opened in March 1973 under Woodbury Corporation, on the corner of University Parkway and State Street, and for thirty years it did what every mall of its generation did. Then the generation ended. Across the United States the enclosed mall of the seventies went dark, was demolished, or limped on with half its units papered over. Orem's did none of those things.
What is there now is University Place: a mixed use district of roughly 120 acres under a revitalization reported at around 500 million dollars, carrying on the order of 1.2 million square feet of retail with more than 150 stores, plus apartments, offices, a cinema and a hotel. Anchor department stores and a large home furnishings retailer hold down the retail. The 545 University Place office building is complete and occupied.
The single most important change is the least photogenic. A public street called Park Avenue has been cut straight through the middle of the campus, connecting State Street to 800 East, with curbside access to the central green on its south side and the office park on its north. A shopping center with a road through it stops being a building surrounded by parking and starts behaving like a piece of town, which was the whole design argument.
University Place in numbers
1973
when University Mall opened, in March
120 acres
the site under revitalization
150+
stores across roughly 1.2m square feet
2 acres
of public green at The Orchard
What is built
What is finished here, and what is still a rendering
This is a long project with phases stretching over years, and the published material understandably shows the whole vision at once. For anybody planning around it, whether that is a shop, an office, a flat or a purchase in the streets nearby, the distinction between delivered and drawn is the one that matters.
| The piece | Status as of September 2026 | What it means on the ground |
|---|---|---|
| The retail core | Trading, with more than 150 stores and a cinema | Open hours are ten until nine Monday to Saturday and noon until six on Sunday |
| The Orchard | Built and programmed year round | About two acres of green with a stage, a choreographed show fountain and a play area, free to use |
| Park Avenue | Cut through the campus | A public street linking State Street and 800 East, with curbside access to the green |
| 545 University Place | Complete and occupied | Finished, leased office space, the first built piece of the office park |
| The wider office park | In progress | Park Avenue's north side is the access for it; confirm any specific building before planning around it |
| Residential | Apartments delivered and occupied | Most of Orem's newest attached homes sit here rather than on open land |
This is a phased development and the phases move. Confirm the current position with the leasing office before you plan around a specific building, rather than reading it off a plan drawing or a listing photograph.
Announced is not built, and this site has been announced for a long time. The revitalization figure of around 500 million dollars, the 120 acre footprint and the roughly 1.2 million square feet of retail describe the project as a whole rather than the state of the ground on any given day. Some phases are complete and trading, some are under construction, and some are still drawings. If a decision of yours depends on a specific building, a specific tenant or a specific opening date, get it in writing from the leasing office before you act on it. Development timelines here have moved more than once.
The free half
Two acres of grass with a stage and a fountain in it
The Orchard is the reason this entry is on a things to do list rather than a shopping guide. It is a green space in the middle of the campus, roughly the size of two football fields, with an outdoor stage, a choreographed show fountain that runs on a schedule rather than continuously, an indoor and outdoor play area for children, and a lot of open grass. It costs nothing and it keeps the district's own hours.
It is programmed rather than merely maintained, which is the difference between a lawn and a public space. Through the warm months there is a free events calendar here, from cultural festivals and craft fairs to outdoor concerts and children's activities, and it turns the green into the closest thing Orem has to a town square on a summer evening. The lineup is published by University Place and changes from year to year, so check the current calendar before you count on a particular event.
It also plays a part in the city's own festival week. Orchard's Jam brings a strand of OremFest here in early June, which puts the city's June festival on the civic block and a private developer's green in the same week, roughly a mile apart. For a city with no obvious downtown, those two spaces between them do the work a high street would do somewhere else.
What The Orchard is not is a park in the municipal sense. It is privately owned ground with published rules, opening hours and its own security, and it closes when the district closes. That is a fair trade for a fountain, a stage and a free events program, but it is worth knowing before you plan a picnic at nine in the evening.
Orem never built a downtown, so it ended up with two: a civic block with a playground on it and a developer's green with a fountain, a mile apart.
Arriving
The one address in Orem you can genuinely reach without a car
The transit position
University Place sits on the University Parkway corridor, which is the spine the whole city runs on, and the UVX bus rapid transit line stops here. UVX runs west to the Orem Central FrontRunner station and south into Provo, in dedicated lanes for much of the way, at roughly ten to fifteen minute frequencies through the day.
One thing worth knowing, since older signs and web pages still say otherwise: UVX ran fare free from its launch until August 2024, and it has charged a fare since, currently $2.50 with a $5 day pass. University students, faculty and staff continue to ride free on institutional passes. Fares change, so confirm the current one with the transit authority before you plan around it.
The junction
The site is on the corner of University Parkway and State Street, which is the busiest junction in Orem and the point where the retail corridor and the north to south highway cross. Park Avenue, the new street through the campus, was cut partly to take pressure off that corner by giving the district an internal circulation route between State Street and 800 East.
In practical terms this means the district is easy to reach and awkward to leave at five in the evening. If you are coming from the south or the west, the State Street approach is usually the cleaner one; from the bench, 800 East and Park Avenue put you inside the campus without touching the main junction at all.
The campus a few minutes west is covered on the region page. Utah Valley University sits along I-15 at the west end of the same corridor and is Orem's largest employer, and the two campuses in this valley, their venues, their capacities, their museums and what a game day does to University Parkway are all covered on the BYU and UVU page. Here the focus stays on the commercial district rather than the university's traffic story or its calendar.
What is near it
Four things within four minutes of this junction
South down State
The SCERA
A longtime arts campus with two indoor theaters, a free city history museum, and an outdoor amphitheater in a park a mile and a half south.
The SCERA pageNorth on State
City Center Park
The civic block: a volunteer built all abilities playground, a library with two stained glass walls, and the June festival.
The civic blockThe housing angle
A built out city
Most of Orem's newest attached homes sit on or around this district, because there is almost nowhere else for them to go.
The mover's pageNorth east
The Murdock Canal Trail
Seventeen paved miles begin at 1100 East 800 North in this city and run the bench all the way to Lehi.
Read the guideWhere this sits
One district inside the wider city
Everything above is one privately owned 120 acre site. What follows is the rest of Orem around it, and where to read about it.
The overview
Orem, in full
The full Orem overview: the ranked twelve, the parks, the arts and the buying side of the city.
Read the pageWhat to do here
The top 12, ranked
The ranked twelve for this city, priced, seasoned and sorted.
Read the pageThe practical guide
The Orem city guide
Where the relocation numbers live: prices, taxes, school assignments and drive times.
Read the guideScott Buehler
Moving Utah About Scott
Keep reading
More of Orem on The Local
Things to do
The top 12, ranked
Twelve picks in a finished city, with what each costs and the month it works on.
Read the guideArts nonprofit
The SCERA
A longtime arts nonprofit with a hillside amphitheater, two indoor theaters and a free museum.
Read the guide1880
Nielsen's Grove
A Danish gardener's pleasure ground of 1880, lost to swamp, and rebuilt on 21 acres.
Read the guideThe civic block
City Center Park
A playground 4,100 volunteers built in six and a half days, beside two glass walls.
Read the guideMoving here
A built out city
Buying in a city that has essentially run out of vacant ground, and what that does to the search.
Read the guideThe overview
Orem, in full
The arts institution, the district, the oldest park, the civic block and the finished ground.
Read the pageQuick answers
University Place, answered
The old University Mall, being rebuilt rather than abandoned. The mall opened in March 1973 under Woodbury Corporation at the corner of University Parkway and State Street, and it is now a mixed use district of roughly 120 acres under a revitalization reported at around 500 million dollars, carrying on the order of 1.2 million square feet of retail with more than 150 stores, plus apartments, offices, a cinema and a hotel. Anchor department stores and a large home furnishings retailer hold down the retail, and a new public street called Park Avenue runs through the middle of the campus.
The free half of the district. It is a green space of about two acres in the middle of the campus, roughly the size of two football fields, with an outdoor stage, a choreographed show fountain, an indoor and outdoor children's play area and a lot of open grass. It costs nothing to use, it keeps the district's hours of ten until nine Monday to Saturday and noon until six on Sunday, and it is programmed with events all year rather than only in summer. It is privately owned ground rather than a city park.
The summer program is. Through the warm months The Orchard runs a free calendar of outdoor events, from cultural festivals and craft fairs to outdoor concerts, plus a strand of the city's own June festival, Orchard's Jam. The lineup is published by University Place and changes from year to year, so check the current calendar before you travel for a specific event.
Ten in the morning until nine at night Monday to Saturday, and noon until six on Sunday, though hours can shift with the season and around holidays, so confirm before an evening visit. The Orchard, the two acre green in the middle of the campus, keeps the same pattern, which is worth knowing if you were planning to sit out on a summer evening after nine. The address is 575 East University Parkway, on the corner of University Parkway and State Street, and the cinema on site runs its own later schedule.
A new public street cut straight through the middle of the campus, connecting State Street to 800 East. Its south side provides curbside access to The Orchard and its north side serves the office park. The point of it is circulation: a shopping center with a road through it behaves like a piece of town rather than a building surrounded by a parking lot, and it gives the district an internal route between two major streets without going through the University Parkway junction.
No, and that is the single most important thing to hold in mind. It is a long multi phase project. The retail core is trading, The Orchard is built and programmed, Park Avenue is cut, apartments are occupied and the 545 University Place office building is complete and occupied. The wider office park is in progress and other pieces are still drawings. If a decision of yours depends on a specific building, tenant or opening date, confirm it in writing with the leasing office rather than acting on a plan drawing.
Yes, and it is the one address in Orem where that is straightforwardly true. The UVX bus rapid transit line stops here and runs west to the Orem Central FrontRunner station and south into Provo, in dedicated lanes for much of the route, at roughly ten to fifteen minute frequencies through the day. One correction on the fare: UVX ran fare free until August 2024 and has charged a regular fare of $2.50 with a $5 day pass since 18 August 2024. University students, faculty and staff still ride free on institutional passes.
Yes, and it is where a large share of Orem's newest homes are. The district includes apartments as part of the mixed use plan, and because the city is essentially full, with very little open land left, most of Orem's new attached homes arrive by building on already used ground like this rather than as new subdivisions on open fields. For a buyer, that means the newest homes in the city cluster on and around this corridor, and older detached houses make up almost everything else.
Woodbury Corporation, which opened University Mall on the site in March 1973 and has run the redevelopment since. It is private ground rather than city ground, which has practical consequences: the district publishes its own hours, its own rules for The Orchard and its own security arrangements, and it closes when the district closes. The City of Orem's own public spaces, including City Center Park and the civic block, operate to different rules and different hours.
The one place in Orem where new homes actually arrive
In a city with very little open land left, this district is where much of the newest housing is, and a corridor address here buys something unusual for Utah Valley: a rapid bus line, a commuter rail station within a short ride, shopping on foot and a two acre green with a fountain in it. Whether that trade is right for you depends on what you want from a street. Tell me what you are weighing and I will put you with a Utah County partner agent who works this corridor, and stay on the financing side.
Or call Scott: (435) 357-4345or send Scott a message
Keep going
Continue your Orem research
Eight more doors into Orem, chosen for what this page covers.
Questions about Orem?
Call Scott, send a message, or find out what your Orem home is worth. No pressure, no obligation.
Referral Disclosure: For moves outside Southern Utah, I can connect you with trusted local agents. If you choose to work with one, their brokerage pays my brokerage (Real Broker, LLC) a referral fee from their commission. This costs you nothing extra, and you are never obligated to use my referral.