Skip to content

The Local

The river West Jordan

The reach with a working flour mill on the bank

The Jordan River through West Jordan

Archibald Gardner put a flour mill on this bank in 1853 and the 1877 replacement is still standing, with a restaurant inside it and a light rail platform across the road. That makes this one of the very few points on the whole corridor where you can arrive by train and be on the trail in two minutes. It is also where one of the last unfinished pieces of the regional trail sat, until a planning document unlocked more than two and a half million dollars to close it.

Scott BuehlerBy Scott Buehler, Moving Utah Updated October 2026

The short answer

The Jordan River runs up the east side of West Jordan, and the reach worth knowing is at 7800 South, at about 1000 West, right beside Gardner Village and its 1877 flour mill. What makes this stretch different from any other city's stretch of the same river is the light rail platform across the road: Historic Gardner station on the Red Line puts you two minutes from the paved trail, so you can arrive by train and be walking the river without a car. Head south and the path runs flat and paved about a mile and a half toward 9000 South. The one thing to plan around is the underpass at the mill, which sits at the low point of the reach and closes in high spring water, with a signed detour up through the village when it does.

WhereThe 7800 South trailhead at about 1000 West, beside Gardner Village
Arrive by railHistoric Gardner station, Red Line, across 7800 South
The reachFlat, paved, about 1.5 miles south toward 9000 South
Watch forThe 7800 South underpass floods in high spring water
CostFree trail; about 130 free park and ride spaces at the station

Start here


This reach has a mill on it, and the mill is the reason the city exists

Every city on this river has a reach and most of them are ordinary green corridor. West Jordan's is not, because of what stands on the bank at 7800 South. Archibald Gardner built the area's first flour mill on this water in 1853, out of logs hauled by horse team from a canyon in the Oquirrhs, and the larger mill that replaced it in 1877 is still there, listed on the National Register, with a restaurant in it. A trail that runs past a working nineteenth century mill site is a different kind of walk from a trail that runs past a hedge.

That is the anchor for the whole reach and it is also the practical hub of it. The trail access at 7800 South sits at about 1000 West, immediately beside the mill, and Historic Gardner station on the Red Line stands across the road at 1127 West with about 130 free park and ride spaces. So this is one of the very few points on the entire corridor where you can arrive by train, be on the trail in two minutes, ride a flat paved reach, and eat lunch inside a building from 1877 without ever touching a car.

Head south from that point and the ground opens out. The section from 7800 South down toward 9000 South runs about a mile and a half one way with barely any elevation change at all, which makes it one of the easiest stretches of the whole corridor for a stroller, a road bike or anyone who does not want a hill. There are no restrooms at either end of it, dogs are allowed on a leash, and the surface is paved throughout.

This reach in numbers

1853

the year the first mill was built on this bank

1.5

miles from the 7800 South trailhead south, one way

2011

the year a rail platform opened beside the trailhead

47,000

vehicles a day on the road the trail had to get under

The interesting part


This city held one of the last unfinished pieces of the whole trail

For years the corridor through this part of the valley was not continuous, and the missing piece was here. What West Jordan did about it is the most substantial thing any of this river's cities has to say about its own reach.

The gap ran roughly between 8600 South and 9400 South, shared between West Jordan and the city to the east, and it was a real break rather than a rough patch. The trail delivered you on to a road and left you there. The obstacle was 9000 South, a four lane road carrying more than 47,000 vehicles a day at that point, and a surface crossing was never going to be the answer for a family on bicycles.

What closed it was a plan, not a developer. West Jordan wrote a city trail action plan with the National Park Service's rivers and trails assistance program and more than seventeen stakeholders, and that plan unlocked over 2.6 million dollars to build a trail segment of about 1.2 miles. The engineering answer to 9000 South was to go under it: 1.1 million dollars of state funding was directed at a pedestrian underpass beneath the road, so the trail passes below the traffic rather than across it. Costed whole, the full 8600 South to 9400 South closure came to just over 3 million dollars, with the underpass as the expensive keystone rather than the entire job. These are the costs of a project delivered in stages over several years, not a live construction budget.

A planning document is an odd thing to celebrate on a river, and it is the right thing to celebrate here. Most trail miles get built because a developer is required to build them or because a city already owns the ground. This mile and a bit got built because a city with neither of those advantages sat down with a federal assistance program and seventeen other parties and wrote a plan good enough to attract more than two and a half million dollars. If you want to know why this reach rides as one continuous stretch rather than a dead end, that is the answer, and it is not something you can see from the trail itself.

The weak point


The underpass at the mill goes under water before anything else does

The trail passes beneath 7800 South at the mill rather than crossing it at the lights, which is what makes the reach continuous and pleasant almost all of the time. It is also the lowest point on this stretch, and in a high water spring it is the first thing to go. On 11 March 2024 the city closed it until further notice, because releases out of Utah Lake had pushed the river high enough to make the underpass unsafe, and said it would clean up and assess what needed rebuilding before reopening.

What is worth carrying away is not that one closure but the detour the city published with it, because it tells you exactly how this reach is stitched together. Trail users were told to access Gardner Village, cross at 7800 South, and reconnect with the trail near Historic Gardner Station. In other words, when the engineered route under the road fails, the fallback is to walk up through a nineteenth century shopping village and cross at the lights beside a light rail platform.

That is a genuinely unusual piece of trail geography and it is the most useful thing to know here for anyone who rides in April or May. If you arrive at the mill in a high water year and find the underpass shut, you have not hit a dead end. You have hit a two minute walk through a parking lot, a pedestrian crossing, and a station forecourt, and then you are back on the trail heading south.

When the engineered crossing floods, the detour is a walk through a village of buildings that were moved here in the 1980s.

The other old line


The platform beside the trailhead is standing on an 1872 railway

Two nineteenth century industrial routes cross within a few hundred yards of each other here, and only one of them is obvious. The mill is on the river. The other one is under the trains.

Historic Gardner station opened on 7 August 2011 at 1127 West 7800 South, an at grade platform on the Red Line, with about 130 park and ride spaces and a UTA bus route calling there. It sits just west of the river, with the mill and its village across the road to the north. In the early planning stages it was going to be called Gardner Village, and the name it ended up with says the same thing more carefully.

The line it stands on is much older than the platform. The Red Line's Mid Jordan leg runs 10.6 miles on the corridor of a narrow gauge railway built in 1872 between Sandy and a canyon in the Oquirrhs, which was sold to the Denver and Rio Grande Western in 1881 and became its Bingham Branch, and later ended up as a Union Pacific industrial lead. UTA bought access to the corridor in May 2002 and the roadbed and track in March 2007, began construction in May 2008, and opened the whole leg in August 2011.

So the two hundred yards of ground around this trailhead carry a mill site in continuous use since 1853, a railway alignment surveyed in 1872, and a light rail platform opened in 2011, with a paved river trail threaded between them. That is a lot of separate centuries on one bank, and it is why this reach reads differently from every other city's stretch of the same river.

The road names out west are the same history, and they lead somewhere this stretch does not go. Old Bingham Highway and New Bingham Highway both run west from here toward the range, and the excavation at the far end of that story belongs to the county guide and to the town at the foot of it, not to West Jordan. The Mountain View Corridor runs south west from here on its own long timeline; the Herriman companion carries that in full, and this stretch leaves it there.

Quick answers


This reach, answered

At 7800 South, at about 1000 West, immediately beside Gardner Village and the 1877 flour mill. Historic Gardner station on the Red Line stands across 7800 South at 1127 West with about 130 free park and ride spaces, so this is one of very few access points on the whole corridor that you can reach by light rail. From the platform to the trail is a two minute walk, with the road crossing being the only obstacle between them.

Yes, and it is the defining practical fact about this reach. Historic Gardner station opened on 7 August 2011 at 1127 West 7800 South, sits just west of the river with the mill and the village across the road to the north, and provides trail access directly. That makes a completely car free outing possible: Red Line in, a flat paved ride or walk south, lunch inside a nineteenth century flour mill, and the train home.

About a mile and a half one way from the 7800 South trailhead down toward 9000 South, so roughly three miles out and back, with barely any elevation change across the whole of it. The surface is paved throughout. There are no restrooms at either end of that section, which is the detail most worth planning for, and dogs are allowed on the reach provided they are on a leash.

Because it is the low point of this reach and it floods. On 11 March 2024 the City of West Jordan closed the underpass until further notice after releases out of Utah Lake pushed the river high enough to make it unsafe, and said it would clean up and assess any reconstruction before reopening. High spring water is the trigger, so the risk window is the runoff season rather than the year as a whole.

The city's own published detour routes trail users up into Gardner Village, across 7800 South at street level, and back on to the trail near Historic Gardner Station. It is a short walk rather than a real diversion, and it is a genuinely odd piece of trail geography: when the engineered crossing under the road fails, the fallback is a footpath through a nineteenth century shopping village and a crossing beside a light rail platform.

Yes, and closing it is the most substantial thing this city has to say about its own reach. The gap ran roughly between 8600 South and 9400 South, shared with the city to the east, and the obstacle was 9000 South, a four lane road carrying more than 47,000 vehicles a day. West Jordan wrote a trail action plan with the National Park Service's rivers and trails assistance program and more than seventeen stakeholders, and that plan unlocked over 2.6 million dollars to build about 1.2 miles of trail.

That was the engineering answer to the gap, and 1.1 million dollars of state funding was directed at building it. A surface crossing of a four lane road carrying more than 47,000 vehicles a day was never going to work for people on bicycles, so the trail was designed to go under the road instead. The full 8600 South to 9400 South closure was costed at just over 3 million dollars, with the underpass as the expensive keystone rather than the whole job.

Because moving water was the power supply, and Archibald Gardner was a millwright. He reached Utah in 1847 and built the area's first flour mill on this bank in 1853 out of logs hauled by horse team from a canyon in the Oquirrhs. The larger mill that replaced it in 1877 is still standing, is listed on the National Register of Historic Places, and has had a restaurant operating inside it since 1990. The city grew around the mill rather than the other way round.

A very old one. The Red Line's Mid Jordan leg runs 10.6 miles on the corridor of a narrow gauge railway built in 1872 between Sandy and a canyon in the Oquirrhs, which was sold to the Denver and Rio Grande Western in 1881 as its Bingham Branch and later became a Union Pacific industrial lead. UTA bought access to the corridor in May 2002 and the roadbed and track in March 2007, started construction in May 2008 and opened the leg in August 2011.

Scott Buehler, Moving Utah

A trailhead with a train and a flour mill at the same address

The blocks around 7800 South and 1000 West are the oldest ground in this city and the best connected, with a rail platform, a river trail and a nineteenth century village inside a few hundred yards of each other, and they behave nothing like the newer streets out toward the mountains. Tell me what you are weighing and I will put you with a Salt Lake County partner agent who knows which of these streets back on to the corridor and which only look as though they do, and stay on the file for the homework and the financing side.

Or call Scott: (435) 357-4345or send Scott a message

Keep going


Continue your West Jordan research

Eight more doors into West Jordan, chosen for what this page covers.

Scott Buehler

Questions about West Jordan?

Call Scott, send a message, or find out what your West Jordan home is worth. No pressure, no obligation.

Referral Disclosure: For moves outside Southern Utah, I can connect you with trusted local agents. If you choose to work with one, their brokerage pays my brokerage (Real Broker, LLC) a referral fee from their commission. This costs you nothing extra, and you are never obligated to use my referral.